Site Readiness

Mid Construction
Pre Drywall Site Readiness

Before your blower door or airtightness test can be conducted at the pre-drywall stage, please ensure all of the following items have been completed. This helps ensure an accurate test result and avoids delays on site.

Pre-Test Checklist

  • Cover and seal missing or broken window or exterior door openings
  • Close and latch all windows.
  • Close all exterior doors (Ensure door hardware has been installed)
  • Close or seal the attic hatch.
  • Close or seal the crawl space access.
  • Close or seal all knee wall access doors.
  • Fill all floor drains with water.
  • Fill all plumbing traps with water.
  • Ensure there are reliable and accessible electrical hookups on site that can be used for testing

If you have any questions about site preparation or need to reschedule your test, please contact us at 1-877-541-4280.

Egnite Sustainability Inc

Energy Efficiency Consulting & Electrical Energy Solutions

1-877-541-4280[email protected]
227 - 1889 Springfield Rd
Kelowna, BC, V1Y 5V5

© 2026 Egnite Sustainability Inc. All rights reserved.

Okanagan Valley - Kelowna · Penticton · Vernon · Lake Country · Summerland